Please note that the estimated construction starting date is subject to the following:
Timely Right of Way Acquisition, Federal Permits Clearance, Utility Relocation and Funding.

For information on completed, future or on-hold projects please visit the main Town Projects and Developments page.

Click on the title for more information.

Title Status Est. Start Est. End Type Details
Pusch View Lane Bridge Overlay Active 4/30/18 5/31/18 Roadway Projects Removal and replacement of pavement on the Pusch View Lane bridge
Palisades Multi-Use Path Active 1/1/2019 Roadway Projects Construction of a new multi-use path along Palisades Road
2017-2018 TOV Annual Roadway Striping Active 4/2/2018 4/30/2018 Roadway Projects Longline striping is taking place on arterial, collector and residential streets throughout Oro Valley during April of 2018.
Tangerine Rd Chip Seal - ADOT Project Active 3/5/2018 Mid-April, 2018 Roadway Projects The Arizona Department of Transportation is working to improve Tangerine Road between First Avenue and State Route 77/Oracle Road in Oro Valley.
La Canada Drive at Oro Valley Community Center Pedestrian Improvements Active 12/10/2017 4/1/2018 Roadway Projects Pedestrian improvements, including safety improvements and a new traffic signal, at the intersection of La Canada Drive and Oro Valley Community Center
Tangerine Road: I-10 to La Canada Drive Active 2016 Roadway Projects RTA Project - 10 mile widening from 2 to 4 lanes with sidewalks and multi use lanes
La Canada & Moore Intersection Improvements Active Design: Summer 2018, construction: Spring 2019 Late 2019 or early 2020 Roadway Projects Project assessment phase
Spring 2018 PROPOSED Pavement Preservation Future 3/1/2018 5/31/2018 Roadway Projects Surface treatments being applied to regional local roads, including specific subdivisions and public roadways
La Cholla Widening - Overton to Tangerine (Design Phase) Active July 2015 June 2017 Roadway Projects La Cholla Blvd widening to a 4-lane divided street from Lambert Ln to Tangerine Rd